PDF4PRO ⚡AMP

Modern search engine that looking for books and documents around the web

Example: barber

A. Introduction - NERC

Standard IRO-008-2 Reliability Coordinator Operational Analyses and real - time Assessments Page 1 of 14 A. Introduction 1. Title: Reliability Coordinator Operational Analyses and real - time Assessments 2. Number: IRO-008-2 3. Purpose: Perform analyses and assessments to prevent instability, uncontrolled separation, or Cascading. 4. Applicability Reliability Coordinator. 5. Proposed Effective Date: See Implementation Plan. 6. Background See Project 2014-03 project page. B. Requirements and Measures R1. Each Reliability Coordinator shall perform an Operational Planning Analysis that will allow it to assess whether the planned operations for the next-day will exceed System operating Limits (SOLs) and Interconnection operating Reliability Limits (IROLs) within its Wide Area.

Standard IRO-008-2 – Reliability Coordinator Operational Analyses and Real-time Assessments Page 2 of 14 R3. Each Reliability Coordinator shall notify impacted entities identified in its Operating

Loading..

Tags:

  Operating, Time, Real

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of A. Introduction - NERC

Related search queries