Transcription of A. Introduction - NERC
{{id}} {{{paragraph}}}
Standard IRO-010-2 Reliability Coordinator Data Specification and Collection A. Introduction 1. Title: Reliability Coordinator Data Specification and Collection 2. Number: IRO-010-2 3. Purpose: To prevent instability, uncontrolled separation, or Cascading outages that adversely impact reliability, by ensuring the Reliability Coordinator has the data it needs to monitor and assess the operation of its Reliability Coordinator Area. 4. Applicability Reliability Coordinator. Balancing Authority. Generator Owner. Generator Operator. Load-Serving Entity. Transmission Operator. Transmission Owner. Distribution Provider. 5. Proposed Effective Date: See Implementation Plan. 6. Background See Project 2014-03 project page.
R2. The Reliability Coordinator shall distribute its data specification to entities that have data required by the Reliability Coordinator’s Operational Planning Analyses, Real-
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
Significant changes from the 2008, Significant changes from the 2011, Changes, Undergraduate Enrollment Trends, 2008, Spring 2008 List of Acceptable Plastics, Modernization of Oil and Gas, Significant, Effective Police Interactions with Youth: Training, Effective Police Interactions with Youth: Training Evaluation, Connecticut, Manufacturing firms and hyperinflation- survival, Design and Analysis of Thorough QT Studies