Transcription of Abel Mine - Risk Assessment
{{id}} {{{paragraph}}}
HMS Consultants Australia Pty Ltd Tel: +61 2 4926 2855 PO Box 799, Newcastle 2300 Fax: +61 2 4926 1508 Level 5, 6 Bolton Street Email: Newcastle NSW 2300 Web: AUSTRALIA Donaldson Coal Pty Ltd Abel Underground Mine Subsidence Management Plan Area 2 Risk Assessment Final Report January 2011 HMS973 This Report is copyright and confidential and no reproduction in whole or in part is authorised without the prior written permission of Abel Management or HMS Consultants Australia Pty. Ltd. This Report was prepared on the basis of information recorded by HMS Consultants Australia Pty Ltd during the risk Assessment workshop held on 16th September 2010, being group consensus opinion of the Abel Underground Mine Area 2 subsidence risk issues. File Report Prepared By Reviewed By Date 20100927 HMS973 Abel SMP Area 2 RA Draft Draft J Smith D Swan & T Sutherland Sept.
Abel Mine – Subsidence Management Plan Area 2 Risk Assessment HMS Consultants Australia Pty Ltd January 2011 Page 1 1 EXECUTIVE SUMMARY In September 2010, HMS Consultants Australia Pty Ltd (HMS) was engaged by Donaldson Coal to
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
Risk Assessment Example Noise Assessment, Risk Assessment Example Noise Assessment Report, Quantitative Risk Assessment Final Report, Workshop Risk Assessment, Workshop, Risk Assessment, Risk Register Report Final 080911, Risk Workshop, Risk, Risk Control Self Assessment, Risk Assessment for DoD, Risk Assessment for DoD Coastal Installations, INTERNATIONAL PROGRAMME ON CHEMICAL