Transcription of ACTIVITY HAZARD ANALYSIS (AHA)
{{id}} {{{paragraph}}}
ACTIVITY HAZARD ANALYSIS (AHA) ACTIVITY /Work Task: Overall Risk Assessment Code (RAC) (Use highest code) Project Location: Risk Assessment Code (RAC) Matrix Contract Number: Severity Probability Date Prepared: Frequent Likely Occasional Seldom Unlikely Prepared By (Name/Title): Catastrophic E E H H M Critical E H H M L Reviewed By (Name/Title): Marginal H M M L L Negligible M L L L L Notes: (Field Notes, Review Comments, etc.) Step 1: Review each " HAZARD " with identified safety "Controls" and determine RAC (See above) RAC Chart Step 2: Identify the RAC (Probability/Severity) as E, H, M, or L for each " HAZARD " on AHA.
Hazard" on AHA. E = Extremely High Risk " Probability" is the likelihood to cause an incident, near miss, or accident and identified as: Frequent, Likely, Occasional, Seldom or Unlikely . H = High Risk " Severity" is the outcome/degree if an incident, near miss, or accident did
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}