Transcription of Alternate Methods for Integrated Cost & Schedule ...
{{id}} {{{paragraph}}}
2010 aace international transactions Alternate Methods for Integrated cost & Schedule contingency estimating John K. Hollmann, PE CCE CEP ABSTRACT Schedule contingency estimating is not widely used in project planning. Even less commonly used are Methods that integrate cost and Schedule contingency estimating . Only one Integrated method is well covered in the literature; , range simulation applied to a cost -loaded CPM Schedule . However, this method, as typically practiced, is poorly aligned with some of aace international s established principles for good contingency estimating practice. This paper presents the most commonly used Critical Path Method (CPM) model-based Methods , as well as an Alternate hybrid parametric model/expected-value method that does not rely on the CPM model and is designed to better align with principles of good contingency estimating practice while being practical to use on all projects.
2010 AACE INTERNATIONAL TRANSACTIONS RISK.01.1 RISK.01 Alternate Methods for Integrated Cost & Schedule Contingency Estimating John K. Hollmann, PE CCE CEP
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
2005 AACE International Transactions, Termination, AACE International, AACE, AACE Transactions, 2005, Core Competencies, Expectations and Career Path, AACE INTERNATIONAL TRANSACTIONS, Basis of Estimate, AACE International’s Professional Practice Guide, AACE International’s Professional Practice Guide to Productivity, Meeting of the AACE International 2015, International