Transcription of APPENDIX A Activity Hazard Analysis
{{id}} {{{paragraph}}}
APPENDIX A Activity Hazard Analysis Note: Activity Hazard Analysis will be prepared and inserted prior to the start of work APPENDIX B Forms Risk Mitigation Two-Week Look-Ahead Form Safety plan for week ending: Project/ Location: Plan Prepared by: Next Two Weeks Scope of Work: Contractor: Meeting date: Dated: Identified Risks/Exposures/ hazards : Control Measures: Additional Activity hazards Analysis Required: Subcontractors Mobilizing/Demobilizing: Audit/Inspections Scheduled: Competent Person Changes:Planned Orientation/Training : Recommendations/Comments/Concerns: Note: This information should be incorporated into the meeting minutes. _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ SAFETY MEETING SIGN-IN SHEET Safety Meeting Presenter: _____ Date: Current Weather Conditions: Temperature (oF) = _____ Wind Direction = _____ Wind Speed = _____ Clear - Sunny Cloudy Rain - Snow Forecast = Current Site Conditions (circle as appropriate):Dry - Wet - Muddy - Frozen - Snow Cover
Steps of Task Hazard/Reaction to Change Safe Plan Resources Team Members’ Signatures The signature of the supervisor confirms the completion of the hazard assessment and Safe Plan of Action by the crew. Supervisors Signature: Date Instructions: 1. Write name of job or task in space provided. 2. Conduct walk-through survey of work area. 3.
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
Section 2: Hazard Analysis Critical Control Points HACCP, Hazard Analysis Critical Control Points, Critical, HACCP - Hazard Analysis and Critical Control Points, Hazard Analysis, Hazard, Hazard Analysis Critical Control Points (HACCP)— Principle, Hazard Analysis Critical Control Points (HACCP)—Principle, Analysis