Transcription of APPENDIX D: COST ESTIMATES FOR STUDY REACHES
{{id}} {{{paragraph}}}
D-1 FINAL EMIGRATION CREEK MANAGEMENT PLANAPPENDIX D: cost ESTIMATES FOR STUDY REACHESThis APPENDIX provides approximate quantity and cost information for the higher-priority improvement measuresidentified in the reach tables in APPENDIX C. These ESTIMATES are for materials and installation costs only. They areapproximate and should be considered order-of-magnitude level ESTIMATES . Project implementation will entailexpenses for site-level plan design, engineering, permitting, monitoring, and maintenance in addition to the costsprovided below. Additionally, the improvement measures included in the following tables are not intended to beexhaustive. It is anticipated that quantities and approaches may vary once site-specific design work is initiated for agiven project or STUDY AssumptionsEstimates for each STUDY reach are based on the unit cost assumptions listed in Table D1. The Table D1 values werederived from the unit costs listed in Table Unit cost and quantity assumptions for specific improvementmeasures are described CleanupThe unit costs listed in Table D1 assume that cleanup events are completed using volunteer labor; the listed unit costvalues are intended to partially cover the cost of supplies, disposal/landfill fees, and mileage to/from disposal sites.
D-4 SALT LAKE CITY RIPARIAN CORRIDOR STUDY Cost Estimates by Reach The following tables (D2–D22) provide approximate cost information for each study reach.
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}