Transcription of Appendix E Environmental Management Plan - …
{{id}} {{{paragraph}}}
DRAFT Environmental Management plan (EMP). For the PROPOSED CONSTRUCTION OF AN ESKOM GENERAL LANDFILL. AND A HAZARDOUS WASTE STORAGE FACILITY IN LEPHALALE, LIMPOPO PROVINCE. May 2009. DEAT Reference Number: 12/12/20/1399. PREPARED FOR: Eskom Holdings (Pty) Ltd Eskom Generation Division P O Box 1091. Johannesburg 2000. Tel: (011) 800-2706. Fax: (011) 800 -3791. COMPILED BY: Envirolution Consulting (Pty) Ltd PO Box 1898. Sunninghill 2157. Tel: (0861) 44 99. Fax: (0861) 62 62 22. E-mail: Website: Copyright Warning - With very few exceptions the copyright of all text and presented information is the exclusive property of Envirolution Consulting. It is a criminal offence to reproduce and/or use, without written consent, any information, technical procedure and/or technique contained in this document.
Environmental Management Plan 4 Eskom Landfill EIA May 2009 Compiled by Envirolution Consulting In general, the purpose of this EMP is to formulate mitigatory measures that should be
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
Construction Noise Mitigation Plan, Plan, Noise, NEW YORK CITY, NOISE CODE, Noise Mitigation, Noise mitigation plan, Construction, 17 Construction environmental management plan, GDOT EDG Cover to Section 1, Georgia Department of Transportation, Construction Plan, Renovation and Construction, PRELIMINARY, Preliminary Environmental