Transcription of Appendix E Environmental Management Plan - Eskom Home
{{id}} {{{paragraph}}}
DRAFT Environmental Management plan (EMP). For the PROPOSED CONSTRUCTION OF AN Eskom GENERAL LANDFILL. AND A HAZARDOUS WASTE STORAGE FACILITY IN LEPHALALE, LIMPOPO PROVINCE. May 2009. DEAT Reference Number: 12/12/20/1399. PREPARED FOR: Eskom Holdings (Pty) Ltd Eskom Generation Division P O Box 1091. Johannesburg 2000. Tel: (011) 800-2706. Fax: (011) 800 -3791. COMPILED BY: Envirolution Consulting (Pty) Ltd PO Box 1898. Sunninghill 2157. Tel: (0861) 44 99. Fax: (0861) 62 62 22. E-mail: Website: Copyright Warning - With very few exceptions the copyright of all text and presented information is the exclusive property of Envirolution Consulting. It is a criminal offence to reproduce and/or use, without written consent, any information, technical procedure and/or technique contained in this document.
Environmental Management Plan 7 Eskom Landfill EIA May 2009 Compiled by Envirolution Consulting The Project Manager will: • Ensure that Eskom and the …
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
Role of Project Management Consultancy in Construction, Role of Project Management Consultancy in Construction Project, Role of Construction Managers, Construction management, Project, Role, Construction, Consultancy, Capability Statement, Handbook SeRVICeS handbOOk, SeRVICeS handbOOk, Handbook, Services – Handbook