Transcription of Appendix E Environmental Management Plan - …
{{id}} {{{paragraph}}}
DRAFT Environmental Management plan (EMP). For the PROPOSED CONSTRUCTION OF AN ESKOM GENERAL LANDFILL. AND A HAZARDOUS WASTE STORAGE FACILITY IN LEPHALALE, LIMPOPO PROVINCE. May 2009. DEAT Reference Number: 12/12/20/1399. PREPARED FOR: Eskom Holdings (Pty) Ltd Eskom Generation Division P O Box 1091. Johannesburg 2000. Tel: (011) 800-2706. Fax: (011) 800 -3791. COMPILED BY: Envirolution Consulting (Pty) Ltd PO Box 1898. Sunninghill 2157. Tel: (0861) 44 99. Fax: (0861) 62 62 22. E-mail: Website: Copyright Warning - With very few exceptions the copyright of all text and presented information is the exclusive property of Envirolution Consulting.
Environmental Management Plan 4 Eskom Landfill EIA May 2009 Compiled by Envirolution Consulting In general, the purpose of this EMP is to formulate mitigatory measures that should be
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
17 Construction environmental management plan, Environmental, CONSTRUCTION AND OPERATIONAL PHASE, Construction and operational phase environmental management plan, Construction, Management, New York City Department of Environmental, New York City Department of Environmental Protection Long, Plan, 17 miami-dade, Construction Quality Assurance Plan