PDF4PRO ⚡AMP

Modern search engine that looking for books and documents around the web

Example: marketing

APPENDIX I – APPLICANT PROJECT MITIGATION

APPENDIX I APPLICANT PROJECT MITIGATION RIPSEY WASH TAILINGS STORAGE FACILITY ENVIRONMENTAL PROTECTION MEASURES AND MONITORING (CORPS FILE NO. SPL-2011-1005-MWL) Prepared for: US Army Corps of Engineers Prepared by: WestLand Resources, Inc. On Behalf of: ASARCO LLC Date: June 19, 2015 TABLE OF CONTENTS AND BACKGROUND .. 2 QUALITY .. 3 WATER PROTECTION MEASURES .. 3 Stormwater Diversions .. 4 Upgradient Dam and Spillway .. 4 East Diversion Channel .. 4 West Diversion Pipeline and Detention Ponds .. 4 Stormwater Pollution Prevention Plan .. 4 Spill Prevention, Control, and Countermeasures Plan .. 5 Reclaim (Seepage Control) Ponds and Encasing of Tailings Pipeline with Associated Drain-down Pond .. 6 PROTECTION MEASURES .. 6 Internal Containment Dam and Seepage Collection .. 7 Drain-down Pond .. 8 Groundwater Monitoring Wells .. 8 STORAGE AND HAZARDOUS MATERIALS TRANSPORT MEASURES.

• Arizona Pollutant Discharge Elimination System Mining Multi-sector General Permit (AZPDES Mining MSGP) (ADEQ) • Title V permit amendment (Pinal County) • Mined Land Reclamation permit (Arizona State Mine Inspector) The purpose of this memorandum is to provide a list of the proposed environmental protection and

Loading..

Tags:

  General, Multi, Sector, Azpdes, Sector general

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of APPENDIX I – APPLICANT PROJECT MITIGATION

Related search queries