Transcription of ARTICLE 15. NPDES GENERAL PERMIT RULE PROGRAM
{{id}} {{{paragraph}}}
ARTICLE 15. NPDES GENERAL PERMIT RULE PROGRAMRule 1. GENERAL Provisions327 IAC 15-1-1 PurposeAuthority:IC 13-14-8; IC 13-14-9; IC 13-15-1-2; IC 13-15-2-1; IC 13-18-3 Affected:IC 13-11-2; IC 13-18-3-15; IC 13-18-4 Sec. 1. The purpose of this ARTICLE is to establish NPDES administrative GENERAL PERMIT authority for certain classes orcategories of discharges, except those covered by individual permits, within a geographical area within the state. (Water PollutionControl Division; 327 IAC 15-1-1; filed Aug 31, 1992, 5:00 : 16 IR 15; readopted filed Jan 10, 2001, 3:23 : 24 IR 1518;readopted filed Nov 21, 2007, 1:16 : 20071219-IR-327070553 BFA; readopted filed Jul 29, 2013, 9:21 : 20130828-IR-327130176 BFA; filed Oct 9, 2015, 4:07 : 20151104-IR-327100659 FRA)327 IAC 15-1-2 DefinitionsAuthority:IC 13-14-8; IC 13-14-9; IC 13-15-1-2; IC 13-15-2-1; IC 13-18-3 Affected:IC 13-11-2; IC 13-18-3-15; IC 13-18-4 Sec. 2. In addition to the definitions contained in IC 13-11-2 and 327 IAC , the following definitions apply throughoutthis ARTICLE :(1) "Existing discharge" means any point source discharge of process or storm water which occurs either continuously orintermittently from a property at the time coverage under an individual NPDES PERMIT is being sought.
NPDES GENERAL PERMIT RULE PROGRAM consistent with the federal NPDES permit program administered by the EPA. (b) The commissioner may determine that an individual permit must be obtained under section 9 of this rule.
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}