Transcription of BALLAST WATER MANAGEMENT PLAN
{{id}} {{{paragraph}}}
This BWM Plan has been written by use of a DNV template (BWM-07) BALLAST WATER MANAGEMENT PLAN Vessel name: <NAME OF VESSEL> IMO number: <IMO NO> DNV GL ID: <DNV GL ID> Document reference: <doc. ref.> Document date: <doc. date> Created by: <created by> This BWM Plan has been written by use of a DNV template (BWM-07) ** Please delete the text between the red lines in the vessel specific Plan ** Guidance Note This is a guidance note for the author/editor of this BALLAST WATER MANAGEMENT Plan (BWMP). How to use the template The template is designed to make the preparation of the BWMP as easy as possible. We have included as much standard text as possible, and limited the scope of the plan to the minimum. This plan shall cover all requirements for developing a BWMP in resolution (53). The (53) G4 of the convention is a guide on structure and content on what to include in the BWMP.
cleaning, considerations at design and construction. The Biofouling Management Plan is not ... Ballast water is essential to control trim, list, draught, stability, or stresses of the vessel. However, ... The system should only be operated in accordance with …
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}