Transcription of Basic Rigging Workbook - BNL
{{id}} {{{paragraph}}}
Basic Rigging Workbook Training and Qualifications Program Office October 13, 2008 - 2 - - 3 - Table of Contents Determine Task and Job-Site 4 Characterize the Load .. 7 Specify, Select, and Inspect Rigging 15 Wire rope 15 Synthetic 19 21 Shackles .. 22 Eye 24 Hoist Rings .. 26 Turnbuckles .. 28 Using rope in Rigging Applications .. 29 Lift, Maneuver, and Move Load .. 31 Handling Symmetrical Loads ..31 Handling Asymmetrical Loads ..32 Moving Loads through Vertical 33 Moving Loads through Horizontal 34 Moving Loads around or over Obstacles .. 35 Moving Loads in Close Proximities .. 36 Upending, Inverting, and Rolling 38 Lifting with Hand-Operated Chain Hoists.
• Slings must be removed from service when any of the below listed substandard conditions exist. • Shock loading is prohibited • Ten (10) randomly distributed broken wires in one (1) rope lay, or five (5) broken wires in one (1) strand in one (1) rope lay • …
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}