Transcription of Before the MAHARASHTRA ELECTRICITY …
{{id}} {{{paragraph}}}
RE Tariff Order for FY 2017-18 Page 1 of 92 Before the MAHARASHTRA ELECTRICITY regulatory commission 13th Floor, Centre , World Trade Centre, Cuffe Parade, Mumbai- 400 005 Tel: 22163964/65/69 Fax: 22163976 E-mail: Website: CASE No. 33 of 2017 In the matter of Determination of Generic Tariffs for Renewable Energy for FY 2017-18 Coram Shri. Azeez M. Khan, Member Shri. Deepak Lad, Member ORDER Dated: 28 April, 2017 The commission notified the MERC (Terms and Conditions for Determination of Renewable Energy Tariff) Regulations, 2015, ( RE Tariff Regulations ) on 10 November, 2015. The Regulations specify the terms and conditions and the procedure for determination of Generic Tariff in respect of the following types Renewable Energy (RE) Generation Projects: (a) Wind Power Projects; (b) Biomass-based Power Projects; (c) Non-Fossil Fuel-based Co-Generation Projects; (d) Mini/Micro and other Small Hydro Power Projects; (e) Solar Photo Voltaic (PV) and Solar Thermal Power Projects; (f) Solar Roof-top PV Systems Power Projects.
RE Tariff Order for FY 2017-18 Page 1 of 92 Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION 13th Floor, Centre No.1, World Trade Centre, Cuffe Parade, Mumbai- 400 005
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
Before the MAHARASHTRA ELECTRICITY, Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, Benchmarking Study for Electricity Distribution, Benchmarking Study for Electricity Distribution Companies, Electricity, MAHARASHTRA, Release BLP Wind Project (Amberi) Private, Release BLP Wind Project (Amberi) Private Limited, Tax incentives in India - EY, Interim Reliefs in Arbitral Proceedings