Transcription of Building Over or Near Council Sewer and Water Mains Gosford
{{id}} {{{paragraph}}}
Building OVER OR NEAR Council Sewer AND Water Mains A Guide to Council Requirements for Approval to Build Over or Near Council Water and Sewer Mains JUNE 2014 TABLE OF CONTENTS 1. GENERAL INFORMATION 1. a Water Mains 1. b Sewer Mains 1. c Vacuum Sewer Mains 1. d Sewer rising Mains , low pressure Mains 1. e Sewer tunnels 1. f Sewer manholes, lampholes, dead ends, and vent shaft 1. g How can Sewer and Water Mains affect my proposed development ? 1. h Can a Sewer main be relocated to suit my proposed development? 2. FREQUENTLY ASKED QUESTIONS 3. CONTACTS AND INFORMATION 4. THE IMPACT OF THE ZONE OF INFLUENCE 5. REQUIREMENTS FOR Building OVER OR NEAR Sewer Mains 5.
Sewer mains are generally located within properties and vary in size from 150mm (6 inches) to 300mm (12 inches) in diameter. In some instances sewer carrier mains are located on private property. These mains can be very large ([ 1200mm) and are normally contained within a …
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}