Transcription of Centaur Installation Guide - ANZ Region
{{id}} {{{paragraph}}}
Guide 2 Edition 7 SydneyCentaur Alarm Signalling EquipmentCentaurInstallation GuideGuideGuide 2 Edition 7 SydneyADT FIRE MONITORINGADT FIRE MONITORINGADT FIRE MONITORINGADT FIRE MONITORINGC entaur Installation Guide105 Highbury Rd Burwood. 3125 Phone +613 9211 1161 Fax +613 9211 2930 Alarm Enquiries 1300 360 575 ASE Conversion +613 9805 8889 Centaur ANSWERING YOUR CALL - Guide 2 Edition 7 SydneyTable of ContentsABOUT THE Installation GUIDES3 ABOUT THE CENTAUR3 GENERAL RF THEORY41. Digital Radio Network42. Mobitex43. Frequency of Operation54. Signal Strength55. Hardwire RF Losses76. About Antennae8 INSTALLATION111. Pre- Installation Monitoring Requirements. Examples153. Installing The ASE164. Antenna ASE wiring20A. Introduction20B. Connection Of A Fire Indicator Panel To The Centaur ASE20 ASE Threshold Voltages as Measured at the ASE s I/P Terminals22C. Connection Of An Alarm System with Alarm Outputs Only23D. Power Supply Connection24E. About the Power Supply25F.
CENTAUR – ANSWERING YOUR CALL – Page 555 Guide 2 Edition 7 Sydney 20/11/2000 3. Frequency of Operation The frequency band used by the radio system is in the range 400 to 420 Megahertz (MHz).
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}