PDF4PRO ⚡AMP

Modern search engine that looking for books and documents around the web

Example: air traffic controller

Chapter 15 Construction Survey Procedures

Highway Surveying Manual Page 15-1 January 2005 Chapter 15 Construction Survey Procedures15-01 GeneralIn performing Construction surveying, preparation is a major part of the operation. Study the contract plans, special provisions, Standard Plans, Standard Specifications, the plan quantities, Construction Manual, and the contractor s proposal. Take appropriate measures to protect existing monuments. (See Chapter 16 Monumentation and Survey Records ).Features may be staked directly from the highway center line by station and offset, or they may be staked from some other control point that is more convenient. Depending on the type of work to be performed by the contractor, stakes may be set to mark the actual work, such as clearing limits, or they may be offset in staking completing a staking operation, look at the stakes to be sure that they are in a uniform line if they should be. Double Checking is the most important part of Construction surveying.

Oct 18, 2004 · Data Controllers running Carlson SurvCE software can slope stake with the user entering pivot offsets, pivot elevations and slope ratios from our computer generated Slope Staking reports at any desired station. A customizable slope staking report in TXT or CSV format can be stored in the controller for later downloading. 15-02.8 Additional Notes

Loading..

Tags:

  Chapter, Construction, Survey, Procedures, Survce, Chapter 15 construction survey procedures

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of Chapter 15 Construction Survey Procedures