Transcription of Chapter 26 WIND LOADS: GENERAL REQUIREMENTS
{{id}} {{{paragraph}}}
Chapter 26. wind LOADS: GENERAL REQUIREMENTS . PROCEDURES DEFINITIONS. Scope The following de nitions apply to the provisions of Buildings and other structures, including the Chapters 26 through 31: Main wind -Force Resisting System (MWFRS) and all APPROVED: Acceptable to the authority having components and cladding (C&C) thereof, shall be jurisdiction. designed and constructed to resist the wind loads BASIC wind SPEED, V: Three-second gust determined in accordance with Chapters 26 through speed at 33 ft (10 m) above the ground in Exposure C.
CHAPTER 26 WIND LOADS: GENERAL REQUIREMENTS 242 or 1 percent of the area of that wall, whichever is smaller, and the percentage of openings in the
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
THURSTON COUNTY,, THURSTON COUNTY, WASHINGTON, ADDING TITLE 26, THURSTON COUNTY, SECTION 13, SECTION, 05 Thurston County, Standard Specifications, Section 26, Section 26 05 13 - MEDIUM-VOLTAGE CABLES, SECTION 26 05 13 MEDIUM-VOLTAGE CABLES, Significant changes from ASCE 7, STANDARD HIGHWAY SPECIFICATIONS, New York City