PDF4PRO ⚡AMP

Modern search engine that looking for books and documents around the web

Example: tourism industry

CHAPTER 3 CHECKOUT, CALIBRATION AND MAINTENANCE

Effective01/2002 Page 3-1 CHAPTER 3 CHECKOUT, CALIBRATION AND MAINTENANCEGENERAL!USE STANDARD REFRIGERANT HANDLINGSAFETY PROCEDURES WHEN PERFORMING INSTALLATIONALWAYS WEAR SAFETY GOGGLES, DON'T SPILL OR TOUCHLIQUID REFRIGERANT, AVOID FLAMES, AND EXCESSIVE ONLY IN WELL VENTILATED CHAPTER will help determine if the unit is operating properly and if all electronic devices are working perspecifications. Be sure to read the step first before performing the actual function. This will help prevent anytype of errors that might CHECKOUT PROCEDURET hese sections will checkout the complete operation of the ECO Xtreme Recycling/Charge Station. Refrigerantin recovery tank is required. In order to determine the proper operation, follow the steps in order to determinecorrect operation. If any of the steps fail the checkout, STOP and correct the problem. Refer to CHAPTER 1 orChapter 2 for Confirm panel valves are OFF.

COMPRESSOR OIL REPLACEMENT OIL KIT: EAK0029C01AB TOOLS REQUIRED: Torque Wrench NOTE The oil in the compressor assembly must be changed quarterly. 1. Perform a Recycle on the service hoses, if necessary. For additional information, refer to Chapter 2 (User's Manual) Evacuating Service Hoses. 2. Unplug unit from AC wall outlet. 3.

Loading..

Tags:

  Compressor, Replacement

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of CHAPTER 3 CHECKOUT, CALIBRATION AND MAINTENANCE

Related search queries