Transcription of Chapter 3: Construction Methods and Activities
{{id}} {{{paragraph}}}
Draft EIS and Draft Section 4(f) Evaluation 3-1 June 2017 Chapter 3: Construction Methods and Activities INTRODUCTION This Chapter describes the Construction Methods and Activities for the Hudson Tunnel Project s Preferred Alternative. The Preferred Alternative has two overarching components: (1) the Construction of a new trans-Hudson tunnel (the Hudson river Tunnel) and associated surface and rail system improvements; and (2) the rehabilitation of the existing North river Tunnel.
3.3.4 Tunnel Beneath Hoboken and the Hudson River 3.3.5 River Tunnel In-Water Work 3.3.6 Manhattan Waterfront Area 3.3.7 Twelfth Avenue Shaft, Staging, and Fan Plant Site 3.3.8 Tunnel from 30th Street to PSNY 3.3.9 Coordination with Other Construction Projects 3.3.10 Rehabilitation of North River Tunnel 3.4 Overall Construction Schedule
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}