Draft EIS and Draft Section 4(f) Evaluation 3-1 June 2017 Chapter 3: Construction Methods and Activities INTRODUCTION This Chapter describes the Construction Methods and Activities for the Hudson Tunnel Project s Preferred Alternative. The Preferred Alternative has two overarching components: (1) the Construction of a new trans-Hudson tunnel (the Hudson River Tunnel) and associated surface and rail system improvements; and (2) the rehabilitation of the existing North River Tunnel.
Construction of the Preferred Alternative: New Jersey Figure 3-2a 6/6/2017 K Y a rk £¤ 9 Construction Staging Area t e l n l Northeast Corridor Existing Tunnel Portal New Tunnel Portal New Fan Plant Ventilation Shaft & Construction Staging Area North River Tunnel to be Rehabilitated Cut and Cover Excavation Ground Improvement t e d t d t P a ...