Draft EIS and Draft Section 4(f) Evaluation 3-1 June 2017 Chapter 3: Construction Methods and Activities INTRODUCTION This Chapter describes the Construction Methods and Activities for the Hudson Tunnel Project s Preferred Alternative. The Preferred Alternative has two overarching components: (1) the Construction of a new trans-Hudson tunnel (the Hudson River Tunnel) and associated surface and rail system improvements; and (2) the rehabilitation of the existing North River Tunnel. To ensure that the passenger rail system continues to operate at existing service levels during Construction , the new tunnel would be constructed and put into operation before the rehabilitation of the North River Tunnel occurs. The Project Sponsor that will advance the Project through final design and Construction , including compliance with mitigation measures, has not yet been identified.
(NJ TRANSIT), and/or another entity that has not yet been determined. This chapter provides an overview of the likely construction methods that would be used for the Preferred Alternative, a discussion of locations where construction would occur, and a description of the potential sequencing and schedule for construction. For the new Hudson River
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}