PDF4PRO ⚡AMP

Modern search engine that looking for books and documents around the web

Example: dental hygienist

Chapter 3: Construction Methods and Activities

Draft EIS and Draft Section 4(f) Evaluation 3-1 June 2017 Chapter 3: Construction Methods and Activities INTRODUCTION This Chapter describes the Construction Methods and Activities for the Hudson Tunnel Project s Preferred Alternative. The Preferred Alternative has two overarching components: (1) the Construction of a new trans-Hudson tunnel (the Hudson River Tunnel) and associated surface and rail system improvements; and (2) the rehabilitation of the existing North River Tunnel. To ensure that the passenger rail system continues to operate at existing service levels during Construction , the new tunnel would be constructed and put into operation before the rehabilitation of the North River Tunnel occurs.

Chapter 3: Construction Methods and Activities 3.1 INTRODUCTION ... delivery, and long-term maintenance, where possible. 1 The new Hudson River Tunnel would consist of two separate single-track tunnels, referred to as “tubes” throughout this EIS. This is similar to the North River Tunnel, which also consists of two separate

Loading..

Tags:

  Activities, Construction, Maintenance

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of Chapter 3: Construction Methods and Activities

Related search queries