Table of Contents CHAPTER 3: SUBGRADE, SUBBASES, and BASES 300 GENERAL 301 LIME TREATED SUBGRADE 301-2 MATERIAL 301-3 CONSTRUCTION REQUIREMENTS PREPARATION OF ROADBED APPLICATION OF LIME MIXING COMPACTION AND FINISHING SAFETY PROGRAM 302 CEMENT TREATED SUBGRADE 302-3 CONSTRUCTION REQUIREMENTS MIXING 303 AGGREGATE SUBBASE AND AGGREGATE BASE 303-2 MATERIALS 303-3 CONSTRUCTION REQUIREMENTS PLACEMENT COMPACTION FINISHING CONTRACTOR QUALITY CONTROL 304 CEMENT TREATED BASE 304-3 CONSTRUCTION REQUIREMENTS MIXING COMPACTING AND FINISHING CURING SEAL 305 LEAN CONCRETE BASE 305-3 CONSTRUCTION REQUIREMENTS PLACING AND FINISHING CURING OPENING TO TRAFFIC 306 GEOGRID BASE REINFORCEMENT 306-3 CONSTRUCTION REQUIREMENTS GEOGRID PLACEMENT 307 GEOCOMPOSITE EDGE DRAIN 307-3 CONSTRUCTION REQUIREMENTS CONSTRUCTION METHOD REFERENCES AND ADDITIONAL INFORMATION BLANK FORMST here are no blank forms
occurs because the lime admixture reduces the volume change characteristics and plasticity of the soil. 301-2 Materials . The Special Provisions will specify which type of lime to use. Two kinds of lime may be used for lime treatment: dry hydrated or …
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}