Transcription of CHAPTER 7 CONSTRUCTION PROCEDURES - CSPI
{{id}} {{{paragraph}}}
309 INTRODUCTIONThis CHAPTER presents information of fundamental importance regarding installationand CONSTRUCTION PROCEDURES including base preparation, unloading and assembly,and placement and compaction of the backfill. The emphasis is on corrugated steelpipe in embankment installations such as highway culverts. For pipe in trenchinstallation such as storm sewers, reference should be made to the cspi publication, Modern Sewer Design for a thorough presentation. For additional information,reference may also be made to ASTM recommended practices under ASTM designations A 796 / A 796 M, A 798 / A 798 M, and A 807 / A 807 well situated, properly bedded, accurately assembled, and carefully backfilledgalvanized steel drainage structure will function properly and efficiently over itsdesign life.
309 INTRODUCTION This chapter presents information of fundamental importance regarding installation and construction procedures including base …
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}