7-1 CHAPTER 7 PROJECT COST ESTIMATE GENERAL The PROJECT Cost consisting of Civil Work Cost, ROW Acquisition Cost, Administration Cost, Consultancy Cost (D/D, C/S, and etc.). The PROJECT Costs of the following two (2) options were estimated. CIVIL WORK COST 1) Unit Prices of Construction Items Unit price analysis of major construction items was undertaken. Major unit prices adopted by the study were compared with other projects/studies and shown in Table 2) Civil Work Cost Civil work cost for Option-1: Stage Development is shown in Table Civil work cost for Option-2: Full Development is shown in Table Major quantity of Option-2 by contract package is shown it Table Currency component by foreign, local and tax by construction item was determined by referencing previous studies and projects.
7-3 TABLE 7.2-1 COMPARISON OF UNIT PRICE (2/2) 408 Structural Steel kg 183.23 412(1)b Elastomeric Bearing Pad ( 606 x 306 x 60mm) pcs 6,698.166,985.16 SPL 414(c) Steel Girder Shoe Type F each 110,377.79 SPL 414(d) Ruber Filler (400 x 150 x 50mm) each 865.83 SPL 414(e) Hard Rubber Filler & Restrainer Bolts Dia 30mm sets 1,573.81 SPL 416(1)a Pile …
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}