CHAPTER 7 PROJECT COST ESTIMATE - JICA

7-1 CHAPTER 7 PROJECT COST ESTIMATE GENERAL The PROJECT Cost consisting of Civil Work Cost, ROW Acquisition Cost, Administration Cost, Consultancy Cost (D/D, C/S, and etc.). The PROJECT Costs of the following two (2) options were estimated. CIVIL WORK COST 1) Unit Prices of Construction Items Unit price analysis of major construction items was undertaken. Major unit prices adopted by the study were compared with other projects/studies and shown in Table 2) Civil Work Cost Civil work cost for Option-1: Stage Development is shown in Table Civil work cost for Option-2: Full Development is shown in Table Major quantity of Option-2 by contract package is shown it Table Currency component by foreign, local and tax by construction item was determined by referencing previous studies and projects. Option-1 Stage Construction Initial Stage: 2-lane Construction Widening 4-lane Stage Option-2 Full Development (4-lane from the beginning) 7-2 TABLE COMPARISON OF UNIT PRICE (1/2) HIGHWAYCEARTHWORKS100(1)Clearing and Grubbingha90, 99, 92, 105, 101(1)aRemoval of Structure and , 101(1)bRemoval of Structure and Obstruction (Masonry) 101(1)dRemoval of Structure and Obstruction (Concrete Pavement) 101(

SPL 620 Concrete Barrier (New Jersey Type ) lm 4,660.55 SPL Installation of Fiber Optic lm 6,881.28 SPL Noise Barrier lm 48,031.19 SPL 1110 Toll Road Linghting each 158,671.93 4.0 TOLL PLAZA AND SERVICE AREA SPL 801 Truck Weigning Station set 3,564,478.23 SPL 1041(3)aToll Island, each 244,743.42138,225.73

Loading..

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of CHAPTER 7 PROJECT COST ESTIMATE - JICA

Related search queries