7-1 CHAPTER 7 PROJECT COST ESTIMATE GENERAL The PROJECT Cost consisting of Civil Work Cost, ROW Acquisition Cost, Administration Cost, Consultancy Cost (D/D, C/S, and etc.). The PROJECT Costs of the following two (2) options were estimated. CIVIL WORK COST 1) Unit Prices of Construction Items Unit price analysis of major construction items was undertaken. Major unit prices adopted by the study were compared with other projects/studies and shown in Table 2) Civil Work Cost Civil work cost for Option-1: Stage Development is shown in Table Civil work cost for Option-2: Full Development is shown in Table Major quantity of Option-2 by contract package is shown it Table Currency component by foreign, local and tax by construction item was determined by referencing previous studies and projects.
405(1)e Structural Concrete Class AA 28Mpa for Coping cu.m. 14,057.94 405(1)f Structural Concrete Class AA 28Mpa for Diaphragm cu.m. 18,354.30 405(1)g Structural Concrete Class AA 28Mpa for Deck Slab cu.m. 14,564.68 7,770.61 405(1)h Structural Concrete Class P 38Mpa for Coping cu.m. 13,301.58
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}