Transcription of CHAPTER ## - Draft FIRE SYSTEMS INSPECTION, TESTING …
{{id}} {{{paragraph}}}
CHAPTER 35 - fire SYSTEMS INSPECTION, TESTING , AND MAINTENANCE (ITM) 35 - i A. INTRODUCTION .. 1 B. CHAPTER -SPECIFIC ROLES AND RESPONSIBILITIES .. 1 1. Building Manager .. 1 2. Safety Coordinator .. 1 3. Office of Facilities Management and Reliability (OFMR) .. 2 4. Office of Protection Services (OPS) .. 2 5. Smithsonian Business Ventures, FONZ, and other SI Business Operations .. 3 C. PROGRAM COMPONENTS .. 3 1. Training .. 3 2. Impairments .. 3 3. Required Inspections .. 3 D. RECORDS AND REPORTS .. 3 1. Original Records .. 3 2. ITM Documentation .. 4 3. Information Management 4 4. ITM Report .. 5 E. REFERENCES .. 5 Attachment 1 Automatic Sprinkler Attachment 2 Standpipe and Hose Attachment 3 Private Mains Used for fire Attachment 4 fire Attachment 5 Water Storage Tanks Used for fire Attachment 6 Valves and fire Department Attachment 7 Kitchen Ventilation Hoods and fire Suppression Attachment 8 Halon Attachment 9 Clean Agent fire Extinguishing Attachment 10 fire Detetion and
all fire suppression, detection and alarm systems, smoke control systems, emergency and exit lighting, fire and exit doors, and all other fire protection and life safety systems or equipment. 2. The SI relies on fire protection and life safety systems in its facilities to provide protection of life and property and to ensure the continuity of
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}