Transcription of CMM - Full Version - NRA
{{id}} {{{paragraph}}}
Concrete 8-1 CHAPTER 8 - CONCRETE WJ Martin SCOPE This chapter covers the manufacture and use of concrete in structures. Site monitoring staff should read and obtain a sound understanding of the relevant section of the Standard Specification and the Project Specifications before applying this section of the manual. This chapter contains a substantial amount of information and requirements which are contained in the specifications. This is provided to assist monitoring staff in understanding normal requirements : note that this does not take precedence over the specifications.
Concrete 8-2 Description Superseded code New code Cement: OPC, RHC SABS 471 SANS 50197-1 Cement: PBFC SABS 626 SANS 50197-1 Cement: PC15, RHPC15 SABS 831 SANS 50197-1
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}