Transcription of Code of Practice for Water Infrastructure
{{id}} {{{paragraph}}}
Code of Practice for Water Infrastructure Connections and Developer Services Design and Construction Requirements for Self-Lay Developments July 2020 (Revision 2) Document IW-CDS-5020-03 IW-CDS-5020-03 IW-CDS-5020-03 (Revision 2 2020) IW-CDS-5020-03 (Revision 2 2020) i SCOPE This Code of Practice outlines acceptable typical design and construction details that are required by Irish Water for the provision of Water supply pipes and related Infrastructure in Self-Lay Developments which are to be connected to the Irish Water Network. It shall be used in conjunction with the associated Design Risk Assessments that have been developed which identify the risks that designers shall take into account in the detailed design of the Water supply pipes and related Infrastructure to be connected to the Irish Water Network.
1.17 Fire Authority Liaison 22 ... 3.18 Hydrant, Air Valve, Sluice Valve and Scour Valve Chambers 69 3.19 Water Meter Chambers 72 . IW-CDS-5020-03 (Revision 2 – 2020) vi 3.20 Pressure Reducing/Sustaining Valve Chambers 74 3.21 Scour Chambers 75 …
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}