PDF4PRO ⚡AMP

Modern search engine that looking for books and documents around the web

Example: confidence

COMMISSIONING and FINAL INSTALLATION REPORT

1 ANSTO-E-758 COMMISSIONING and FINAL INSTALLATION REPORT for the STAR ACCELERATOR FACILITY Prepared by David Garton Institute for Nuclear Geophysiology Australian Nuclear Science and Technology Organisation September 2005 2 COMMISSIONING REPORT for the STAR Accelerator Facility Section Contents Page 1 Scope 3 2 Introduction 3 3 Definitions 4 4 Licencing 4 5 Description of the Facility 4 6 Division of Work 5 7 quality Assurance 5 8 Safety Analysis 6 9 Certifications 6 10 Engineering Drawings and design 6 11 Construction Phase 7 12 Testing and Inspection Procedures/Approvals 9 13 Safety hazards and monitoring 9 14 Facility management 10 15 Maintenance programs 10 16 Summary of Commissioned Items 11 17 Acknowledgments 17 18 References 17 19 Appendices 17 Appendix 1 Memorandum, Earthing System 18 Appendix 2 Drawing of the STAR Accelerator layout 19 Appendix 3 Summary of the Acceptance tests 20 Appendix 4 Radiation Surveys 24 3 1.

2 Commissioning Report for the STAR Accelerator Facility Section Contents Page 1 Scope 3 2 Introduction 3 3 Definitions 4 4 Licencing 4 5 Description of the Facility 4 6 Division of Work 5 7 Quality Assurance 5 8 Safety Analysis 6 9 Certifications 6 10 Engineering Drawings and design 6 11 Construction Phase 7 12 Testing and Inspection Procedures/Approvals 9

Loading..

Tags:

  Quality, Commissioning

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of COMMISSIONING and FINAL INSTALLATION REPORT

Related search queries