PDF4PRO ⚡AMP

Modern search engine that looking for books and documents around the web

Example: biology

CONCRETE PAD FOR THREE-PHASE, LOOP-STYLE, 045292 …

UG-1: TransformersGreenbookRev. #13: 12-01-19045292 Page 1 of 8045292 Function:Asset Type:Issued by:Date:12-01-19 Rev. #13: This document replaces PG&E Document 045292 , Rev. #12. For a description of the changes, see Page PAD FOR THREE-PHASE, LOOP-STYLE, PAD- mounted TRANSFORMERSP repared by: ABB1 Electric DistributionDesignMichael Thibault (MLTC)This document is also included in the following manual: Electric and Gas Service Requirements Manual (Greenbook)Purpose and ScopeThis document shows construction details for CONCRETE pads for three-phase, loop-style, pad- mounted transformers. Referto Document 043817 for installation details of three-phase, radial-style, pad- mounted transformers. See Document045290 and Document 045291 for fabrication and installation details of three-phase, loop-style, Information1. When a pad is installed by the customer, that customer shall provide all materials.

UG-1: Transformers Greenbook Concrete Pad for Three-Phase, Loop-Style, Pad-Mounted Transformers 045292 Page 2 of 8 Rev. #13: 12-01-19 12. The area under the pad shall be excavated to the required grade, or to a depth necessary to reach firm,

Loading..

Tags:

  Mounted

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of CONCRETE PAD FOR THREE-PHASE, LOOP-STYLE, 045292 …

Related search queries