Transcription of CONSTRUCTION GUIDE
{{id}} {{{paragraph}}}
CONSTRUCTION guideFor the installation of conduit, manholes and splice boxesOne call to Miss Utility can savetime, money and you pick up any equipment, pick up the phone and call Miss Utility. Miss Utility will notify all applicable utility companies and see to it that your job site is marked for all underground utility lines. One simple phone call can save you the time and hassle of dealing with job site mistakes and delays. Not to mention decrease liability, prevent damage, reduce injuries and possibly save lives. After all, safety is everyone s Miss Utility, at least 48 hours prior to work, at 811 or Safely CHECKLIST1. Call Miss Utility at 811 or at least 48 hours prior to Allow the required time for utilities to mark the underground Respect and protect all Excavate with care. Take all reasonable actions to properly protect, support and backfill underground utility Immediately notify the utility if an underground utility line is If damage creates an emergency, take immediate steps to safeguard life, health and check with your individual jurisdictions with regard to waiting times and specific digging more information, contact Miss Utility or check online at you dig, every UTILITY 811 or s the information in this manual provides general guidelines for the installation of conduit, manholes and splice/pull boxes as it relates to BGE gas a
(cables/gas pipe installed in PVC or flex polyethylene duct or sleeve that is installed directly in ground) This type of system is typically used in rural or suburban areas where special situations exist such as: • Extensive paved areas with concrete or macadam such as parking lots. • Secondary distribution through paved, limited
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}