Draft Construction Work Plan Non-Public Properties Newhall Street Neighborhood Site Hamden, connecticut Revision 0 Prepared for: Olin Corporation Cleveland, Tennessee February 2009 Construction WORK PLAN NON-PUBLIC PROPERTIES, NEWHALL STREET NEIGHBORHOOD HAMDEN, connecticut TABLE OF CONTENTS February 2009 i INTRODUCTION .. 1 SITE HISTORY .. 1 PRE- Construction PREPARATION ACTIVITIES .. 2 REMEDIAL Construction ACTIVITIES .. 4 MOBILIZATION .. 5 SITE PREPARATION .. 8 CLEARING AND GRUBBING .. 14 DEMOLITION AND REMOVAL OF ABOVE GROUND ITEMS .. 15 EXCAVATION, TRANSPORTATION AND DISPOSAL OF IMPACTED FILL MATERIAL .. 15 General .. 15 Excavation Operations in the Backyards of the Properties .. 19 Excavation Operations at Sides and Front yards of the Properties.
Connecticut, to verify and establish existing conditions to allow proper restoration of all existing features removed during Work. 5. Receipt of work plan approvals from Olin and the CTDEP. Anticipated work plans to include: • A Construction Work Plan (this document) that describes the means and methods
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}