Cost Estimating Manual for WSDOT projects November 2008 Cost Estimating Manual for WSDOT projects November 2008 Page ii Cost Estimating Manual for WSDOT projects November 2008 Page iii Foreword Each project is unique. To accurately develop an estimate of the construction costs for a project, an Estimator must be capable of mentally constructing the project and then accounting for all the activities necessary to complete it. Many of the best cost estimators are knowledgeable in both transportation design and construction. Estimators should be shielded from pressures to keep estimates within programmed or desired amounts based on funding availability. Estimators should be free to establish what they consider to be a reasonable estimate based on the scope and schedule of the project and the bidding conditions ( , local and global market conditions) that are anticipated. This guidance has been developed by the Strategic Assessment and Estimating Office (SAEO) in alignment with the goals of the Statewide Program Management Group (SPMG).
this manual, there are certain other conditions, such as design-build project delivery, accelerated projects, and accelerated estimates, which are not addressed in detail. Important Notice The detailed estimate of any phase of an estimate shall not be disclosed to the public and will be kept confidential until the end of the bid opening.
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}