Transcription of CUSTOMER INSTALLATION STANDARDS FOR ELECTRIC …
{{id}} {{{paragraph}}}
CUSTOMERINSTALLATIONSTANDARDSFORELECTRIC SERVICES eptember 4, 2018A transition period will exist in which installations may be approved and connected as long asthey meet either the 2013 or the 2018 editions. Beginning January 2, 2019, only the 2018edition of the CUSTOMER INSTALLATION STANDARDS will be document is not copyrighted. Copying is latest edition is available (See for web address)New and changed information in italicized redSummary of Major Changes from 2013 EditionSections required label/tag shall bepermanently attached and not easily removed. structures allowed over or under company facilities. number and county/parishrequirements added to Required Information Service. Removed typical electrical loads served by open and closed delta transformer installations. shall providerequiredground clearancefor all temporary services. section title to High Rise Building Service with the requirement for customers to Consultthe Companyforinterior meter room locations.
Section 1 Foreword, General Information, and Terms 1.1 Purpose The information contained in this book is presented for use in planning electrical wiring and apparatus installations intended for connection to the Entergy distribution power lines. Current procedures, practices and requirements, adopted by the Entergy companies to assure
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}