Transcription of Design and Build Contract 2011
{{id}} {{{paragraph}}}
The Joint Contracts Tribunal Limited Amendment 1, March 2015 DB 2011 Page 1 Design and Build Contract 2011 Design and Build Contract 2011 Amendment 1 Issued March 2015 (Effective from 6 April 2015 ) CDM Regulations Clause number and heading Action Article 5 heading Delete CDM Co-ordinator and insert Principal Designer Article 5 Delete CDM Co-ordinator and insert Principal Designer ; Delete or, if he ceases to be the CDM Co-ordinator, such other person as the Employer shall appoint pursuant to regulation 14(3) of those regulations and insert or such replacement as the Employer at any time appoints to fulfil that role Article 6 Delete and the SWMP Regulations ; Delete or, if he ceases to be the Principal Contractor, such other contractor as the Employer shall appoint pursuant to regulation 14(3) of the CDM Regulations and/or regulation 4 of the SWMP Regulations and insert or such replacement as the Employer at any time appoints to fulfil that role Footnote [5] Delete the exis
© The Joint Contracts Tribunal Limited Amendment 1, March 2015 DB 2011 Page 1 Design and Build Contract 2011 Design and Build Contract 2011
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
Construction Phase Plan, CDM 2015, Plan of Work Services Summary Stages 0, Plan, Construction, 2015, The Construction Phase Health & Safety Plan, Construction (Design & Management) Regulations 2015, Regulations 2015, Construction (Design and Management) Regulations, Clients’ guide to temporary works