Transcription of Distribution Code Review Panel - DCRP
{{id}} {{{paragraph}}}
Distribution code Review Panel Product Approval Working Group Checklist on Minimum Requirements submission Page 1 of 3 stage Submission General Requirement Agent/ Manufacturer Input data DCRP officials Comments Cover page details filled? (yes/No) 1 File contents index available? (yes/No) General 2 Covering letter is attached? (yes/No) General OES is reviewed by manufacturer & Which? (yes/No) Specific OES of product is reviewed by manufacturer? (yes/No) Do manufacturer complied with relevant IEC/BS standard for product. 3 Product technical checklist sealed by manufacturer & submitted? (yes/No) 4 If standard checklist is not available, does manufacturer proposed new checklist base on relevant IEC/BS?
Distribution Code Review Panel Product Approval Working Group Checklist on Minimum Requirements submission Page 1 of 3 stage Submission General Requirement Agent/ Manufacturer
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
DISTRIBUTION CODE REVIEW PANEL SULTANATE, DISTRIBUTION CODE REVIEW PANEL. SULTANATE, Electrical Plan Review Requirements, Distribution, Code, Review, CHECKLIST FOR 2015 I.B.C.COMMERCIAL, Jr. Olympic Code of Points - Index, PANEL, Supply Code, MADHYA PRADESH ELECTRICITY SUPPLY CODE, 2004, Pulmonary*Function, Four Point Inspection Report Date of Inspection, Four Point Inspection Report Date