Transcription of DIVISION 1 GENERAL DATA - Thieneman Construction
{{id}} {{{paragraph}}}
DIVISION 1 GENERAL DATA 01010-1 SECTION 01010 SUMMARY OF WORK PART 1 GENERAL SECTION INCLUDES A. Description of Existing Facilities B. GENERAL Scope of Work C. Contractor s Responsibilities D. System Operations E. Work Sequence F. Owner Occupancy G. Contract Documents DESCRIPTION OF EXISTING FACILITIES The existing Rosedale Wastewater Treatment facility consists of a 122,000 gpd (average) extended aeration package plant, chlorination (chlorine gas), dechlorination (sulfur dioxide), parshall flume metering structure and post aeration.
01010-1 SECTION 01010 SUMMARY OF WORK PART 1 GENERAL 1.1 SECTION INCLUDES A. Description of Existing Facilities B. General Scope of Work
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
REFERENCE MANUAL, HDPe, Liner, General, Standard Specifications for Transportation, Geosynthetic Institute GRI 475 Kedron, Specification, HIGh-DEnSITy PolyEThylEnE, Polyethylene, Specification and Application of Void, SURFACE MOUNTED HORIZONTAL BABY, Volume VII: Compressed Air and Inert Gas, Water Company POTABLE WATER, Water Company POTABLE WATER MATERIALS GUIDELINE