Transcription of DIVISION 1 GENERAL REQUIREMENTS - usu.edu
{{id}} {{{paragraph}}}
GENERAL REQUIREMENTS 2018 01 0000 - 1 UTAH STATE UNIVERSITY A&E DESIGN MANUAL DIVISION 1 GENERAL REQUIREMENTS 01 18 00 PROJECT UTILITY SOURCES Temporary Utilities: The Contractor shall make arrangements with available utility(s) for temporary connections and bear all costs for these utilities. On the campus proper and some peripheral areas the utilities are University utilities and the contractor shall make arrangements through FD&C for connections. The Contractor shall provide and install meters for measuring use of utilities purchased from Utah State University. FD&C shall read or have the meters read at the beginning of the project, monthly, and at the end of the project. The contractor shall be responsible for all utility costs including those from the University. 01 31 00 PROJECT MANAGEMENT AND COORDINATION GENERAL : The following REQUIREMENTS shall be incorporated in the Contract Documents: A.
general requirements 2018 01 0000 - 1 utah state university a&e design manual . division 1 general requirements . 01 18 00 project utility sources
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
Division, GENERAL REQUIREMENTS, GENERAL 1, General, Division 1 General Requirements, 1 Division 1 General Requirements 1, 1 General, DIVISION 1 GENERAL REQUIREMENTS 1, DIVISION 1 - GENERAL REQUIREMENTS SECTION 01300, DIVISION 1 - GENERAL REQUIREMENTS SECTION 01300 SUBMITTALS, Requirements, DIVISION 1 – GENERAL REQUIREMENTS, Division 1, 1 division 1 – general requirements, DIVISION 1- GENERAL REQUIREMENTS, 01014 Builder's Use of the Premises