PDF4PRO ⚡AMP

Modern search engine that looking for books and documents around the web

Example: air traffic controller

DIVISION 2 SITE WORK - Thieneman Construction

DIVISION 2 SITE WORK02000-1 SECTION 02000 SUBSURFACE EXPLORATION PART 1 GENERAL SCOPE A. Subsurface soil borings in the Construction sites have been made and are exhibited in the Geotechnical Investigation Report included in Appendix A for review by the contractor. B. Contractor should examine the site and make any additional subsurface investigations necessary to ascertain the conditions they might encounter. C. Any conclusions or decisions arrived at on the basis of soil borings shall be the responsibility of the Contractor. By displaying these boring logs, the Engineer does not indicate or infer that they represent underground conditions at other parts of the site D.

02200-1 SECTION 02200 EARTHWORK PART 1 GENERAL 1.1 SECTION INCLUDES A. Excavating for building foundations. B. Excavating for slabs-on-grade, paving, and landscaping.

Loading..

Tags:

  Landscaping

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of DIVISION 2 SITE WORK - Thieneman Construction

Related search queries