DIVISION 2 SITE WORK02000-1 SECTION 02000 SUBSURFACE EXPLORATION PART 1 GENERAL SCOPE A. Subsurface soil borings in the Construction sites have been made and are exhibited in the Geotechnical Investigation Report included in Appendix A for review by the contractor. B. Contractor should examine the site and make any additional subsurface investigations necessary to ascertain the conditions they might encounter. C. Any conclusions or decisions arrived at on the basis of soil borings shall be the responsibility of the Contractor. By displaying these boring logs, the Engineer does not indicate or infer that they represent underground conditions at other parts of the site D. Contractor is advised that ground water tables could change from those indicated in borings or observed at time of bidding. Any such water table variation will not be considered as changed conditions by the Owner, and no extra costs will be allowed for such circumstances.
02200-2 underground services. 1.4 GENERAL GUIDELINES A. Furnish all equipment, tools, materials, and labor to accomplish excavation, backfill,
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}