Transcription of Division 8 Miscellaneous Construction
{{id}} {{{paragraph}}}
2018 Standard Specifications M 41-10 Page 8-1 Division 8 Miscellaneous Construction8-01 Erosion Control and Water Pollution DescriptionThis Work consists of furnishing, installing, maintaining, removing and disposing of high visibility fence, and water pollution and erosion control items in accordance with these Specifications and as shown in the Plans or as designated by the MaterialsMaterials shall meet the requirements of the following sections: Corrugated Polyethylene Drain Pipe (6) Quarry Spalls 9-13 Seed Fertilizer Mulch and Amendments Tackifiers (7) Erosion Control Devices High Visibility Fence Construction Geotextile 9-33 For all seed the Contractor shall furnish the Engineer with the following documentation:1. The state or provincial seed dealer license and Copies of Washington State Department of Agriculture (WSDA) test results on each lot of seed.
2018 Standard Specifications M 41-10 Page 8-1 Division 8 Miscellaneous Construction 8-01 Erosion Control and Water Pollution Control 8-01.1 Description
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
STANDARD CONSTRUCTION SPECIFICATIONS, Standard Construction Specifications Division, GOVERNANCE DOCUMENT CONSTRUCTION, Governance document construction manual construction division, Traffic Division - Request for Trial, Construction, California DEPARTMENT OF TRANSPORTATION, Well Owner’s Handbook, DIVISION, Plantation Shutter Construction Features 2, Division 9 Materials