Transcription of Division 8 Miscellaneous Construction
{{id}} {{{paragraph}}}
2018 Standard Specifications M 41-10 Page 8-1 Division 8 Miscellaneous Construction8-01 erosion control and Water Pollution DescriptionThis Work consists of furnishing, installing, maintaining, removing and disposing of high visibility fence, and water pollution and erosion control items in accordance with these Specifications and as shown in the Plans or as designated by the MaterialsMaterials shall meet the requirements of the following sections: Corrugated Polyethylene Drain Pipe (6) Quarry Spalls 9-13 Seed Fertilizer Mulch and Amendments Tackifiers (7) erosion control Devices High Visibility Fence Construction Geotextile 9-33 For all seed the Contractor shall furnish the Engineer with the following documentation:1.
Erosion Control and Water Pollution Control 8-01 the State. The adaptive management shall use the means and methods identified in this section and means and methods identified in the Washington State Department of Transportation’s Temporary Erosion and Sediment Control Manual or the Washington State
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}