Transcription of Document A401™ – 2017
{{id}} {{{paragraph}}}
Document A401 2017 Standard Form of Agreement Between contractor and subcontractor Init. / AIA Document A401 2017. Copyright 1915, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1967, 1972, 1978, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA Document is protected by Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA Document , or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. To report copyright violations of AIA Contract Documents, e-mail The American Institute of Architects legal counsel, 1 This Document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. AIA Document A201 2017, General Conditions of the Contract for Construction, is adopted in this Document by reference.
Subcontractor. § 3.3.3 The Contractor shall permit the Subcontractor to request information directly from the Architect regarding the percentages of completion and the amount certified on account of Work done by the Subcontractor. § 3.3.4 If hazardous materials or substances are being used on the site by the Contractor, a subcontractor, or anyone
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}