Transcription of Engineering Design and Construction Manual for …
{{id}} {{{paragraph}}}
Engineering Design and Construction Manual for Subdivision in Growth AreasApril 2011 Copyright Growth Areas Authority 2011 This document is subject to copyrightUse of copying of this document in whole or part without acknowledgement ofthe Growth Area Authority constitutes an infringement of Copyright Act 1968 April 2011 Growth Areas AuthorityLevel 2935 Collins StreetMelbourne Victoria 3000 PHONE: (03) 9651 9600E-MAIL: 6 DEFINITIONS 7 PART AOVERVIEW AND BACKGROUND 91. Introduction Background Principles Objectives of the Manual Structure and Content of the Manual Implementation Exceptions Context and Challenges 13 PART BFRAMEWORK AND PROCEDURES 232. Planning Framework Planning Hierarchy State and Local Framework Land Development Objectives and Goals in Growth Areas Land Subdivision process 253. Planning Permits Planning Permit Application for Subdivisions Documentation Requirements for Planning Permit Applications Preliminary Consultation Environmental Assessment Heritage Assessment Plan of Subdivision Developer Contributions Public Transport Strategic and Arterial Roads Waterways and Main Drainage Sewer, Water and Recycled Water Utility Services Traffic Assessment 314.
all stakeholders can be achieved in these parts of the planning process through agreed common processes for approvals and shared engineering infrastructure standards and specifications across Melbourne’s growth areas. This Engineering Design and Construction Manual outlines a series of shared
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}