Deschutes Estuary Feasibility Study, Phase 3 Engineering Design and cost Estimates FINAL REPORT Prepared for: Washington Department of Fish and Wildlife Prepared By: 710 Second Ave, Suite 720 Seattle, WA 98104 Tel: (206) 622-0222 y Fax: (206) 622-4764 In Association With: EDAW, Inc yGeoEngineersFebruary 9, 2007 Moffatt & Nichol Page ES-1 DEFS Engineering Design and cost Estimates Final Report 2/9/2007 Executive Summary The objective of the Deschutes Estuary Feasibility Study (DEFS) is to evaluate the possibility of restoring the Deschutes River estuary to tidal flow as an alternative to the continued management actions necessary to maintain Capitol Lake in its current condition. An important input to this feasibility study is an analysis of the Engineering feasibility and likely cost of the three restoration alternatives under consideration.
DEFS Engineering Design and Cost Estimates – Final Report 2/9/2007 ... Both the raw construction costs – an estimate of the total contractor’s bid – and the total project costs, which include “soft” costs such as engineering, permitting, and right of way acquisition, are
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
NEW YORK DESIGN + CONSTRUCTION, Design, Construction, NEW YORK DESIGN + CONSTRUCTION EXCELLENCE, PLANNING, DESIGN & CONSTRUCTION, AGREEMENT FOR DESIGN BUILD SERVICES, AGREEMENT FOR DESIGN/BUILD SERVICES, STRUCTURAL STEEL DESIGN AND CONSTRUCTION, Design and Construction, Emory University Design & Construction Standards, Recommended Practice For Design and Construction, MERCEDES-BENZ STADIUM – DESIGN AND CONSTRUCTION, PHASES INVOLVED IN DESIGN & CONSTUCTION PROJECTS