Transcription of Engineering Recommendation G87 Issue 2 - 2015
{{id}} {{{paragraph}}}
PRODUCED BY THE OPERATIONS DIRECTORATE OF ENERGY NETWORKS ASSOCIATION Engineering Recommendation G87 Issue 2 - 2015 Guidelines for the Provision of Low Voltage Connections to Multiple Occupancy Buildings PUBLISHING AND COPYRIGHT INFORMATION First published, January 2010 Amendments since publication Issue Date Amendment Issue 1 January 2010 Document first issued. Issue 2 July 2015 Major revision of ER G87 Issue 1, 2010. Document revised to align with and support industry changes and the Smart Meter roll out programme. Details of the technical, general and editorial amendments are included in the associated Document Amendment Summary for this Issue (available on request from the Operations Directorate of ENA). 2015 Energy Networks Association All rights reserved. No part of this publication may be reproduced, stored in a retrieval system or transmitted in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, without the prior written consent of Energy Networks Association.
ENA Engineering Recommendation G87 Issue 2 2015 Page 6 The term “shall” is used in this document where a mandatory requirement is referenced (e.g.
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}